A progress bar should name the work it measures. If it counts uploaded bytes, label it Uploading. Calling the same bar Processing suggests that reaching the end means the result is ready.

Imagine a document importer that uploads a file, reads its rows, validates them, and saves the accepted records. The upload reaches 100% while validation is still running. A single bar labeled "Import progress" now has to sit at 100%, move backward, or conceal the remaining work behind an arbitrary pause at 99%.

I would give this importer separate phases. During transfer, show the bytes sent against the file size. Once the server receives the file, show "Reading rows" without a percentage until it knows the row count. Validation can then show "Checked 800 of 1,200 rows." Saving gets its own status, and the interface announces completion only when the saved records are available.

A count also needs a definition of completion. A row with an invalid date has been checked even though it will not be imported. If the counter advances only for valid rows, 20 rejected rows leave it stuck at 1,180 of 1,200. I would count every checked row toward validation progress and keep accepted and rejected counts alongside it. The result can say "1,180 records saved. 20 rows need corrections," with access to those rows.

A large file may upload quickly and take much longer to validate. Even individual rows can require different amounts of work. If the product needs a time estimate, I would label it as an estimate and base it on observed processing speed. Assigning each phase an equal share of a single bar would hide those differences.

To review the importer, use a small file with deliberately slow validation and several invalid rows. Watch what happens after the upload finishes. The screen should still describe active work, validation should reach its full count, and the final result should account for every row. Then make saving fail. The interface should report that failure without presenting completed validation as a completed import.